A major Wellington housing development is taking shape in Porirua, where Gillies Group expects the first homes at Plimmerton Farm from 2027 onwards.
Before building homes, crews are putting in roads, water and wastewater services. The developer proposes a mix of homes over time, from townhouses and family houses to larger lifestyle properties. Its wider plans include parks, space for a supermarket and local shops, and potential sites for primary and secondary schools. Those are plans for the wider development, not a list of what will open alongside the first homes.

An underpass is part of the developer’s planned connection between the development and the existing village and station. The project brief gives no opening date for that link. The first stage of the housing development was granted resource consent subject to conditions by an independent panel in 2024.
The earthworks visible from the road are making room for some of the infrastructure that comes first. In its November update, Gillies Group says the first reservoir panels are in place and the wastewater detention tank is moving towards roof construction. A water main still needs to be laid from James Street to the reservoir before it can supply the first homes.
The developer says the work also includes protecting and restoring natural areas. It plans to share regular updates about the construction and the environmental work as the neighbourhood takes shape.